Estimated Upgrade Time

The time required to upgrade may vary depending on your server hardware (CPU and memory resources available), the speed of your network connection, and the number of sites hosted on Parallels Pro Control Panel server. The time required to upgrade an Parallels Pro Control Panel server is approximately 60 minutes and the time required to upgrade the sites hosted on Parallels Pro Control Panel is approximately 3 minutes per site. So, assuming there are 10 sites hosted on the Parallels Pro Control Panel server, it will take approximately 90 minutes to complete the upgrade (60 minutes for the server and 30 minutes for 10 sites).

Note: Sites hosted on Parallels Pro Control Panel will be accessible during the upgrade and services such as Web, FTP, and Email will continue to function, except when the site is being upgraded. However, the control panels will be inaccessible during the upgrade. This could typically range from a few minutes to a few hours depending on the number of sites hosted on the server.